Michiel de Ruyter Bridge

We are realizing various civil works at the Michiel de Ruyter Bridge in Urk. For the residents, the Michiel de Ruyter Bridge will act as an important connection between the old and the new part of the village. Nauta is responsible for delivering the new slacking structures that will be installed at this bridge. The slacking structures, cactus poles, scaffolding and footbridges are produces and preserved in Heeg.

The slacking structure on the north side of the bridge has a total length of 30 meters and the slacking structure on the south side has a total length of 26 meters. The 8 cactus posts that serve as mooring posts for freight traffic each have a total length of 16,5 meters. It is expected that the Michiel de Ruyter Bridge can be used this summer. Below you can see a nice impression of this project.